Authorized · Certified · Carolinas
Authorized FAAC dealer, certified installer and integrator
360 Mobile Vision sells, installs, programs and services FAAC for businesses across North and South Carolina — hydraulic swing, slide and underground operators, barriers and safety accessories. Being the authorized dealer as well as the installer is what gets you genuine equipment, a valid warranty and a manufacturer support path when something needs escalating.
- DealerWe quote and supply genuine FAAC equipment, licensing and subscriptions.
- InstallerOur own technicians run the cable, mount the hardware, set the software up and test it — not a subcontractor you have never met.
- IntegratorWe make it work with the cameras, doors, network and identity systems already in the building, rather than leaving you with two systems that do not talk.
- Still here afterwardsService, repair, expansion and takeover of systems somebody else installed. Emergency cover round the clock.
FAAC gate systems planning guide
Selecting FAAC Barriers, Access Accessories and Safety involves more than checking a feature list. Administration, existing hardware, power, networking, integrations, licensing and failure behavior all influence whether the platform is appropriate for a Carolina facility.

Product capabilities worth comparing
Use the following capability map to separate relevant options from features that do not support the operating plan. Final quantities and models follow field validation.
- Product and design guidance
- 615 and current barrier family application fit
- Lane width, beam length, speed and duty cycle
- Loop detectors, photo eyes, edges and traffic signals
- Credential/visitor control, manual release and backup power
- Site survey, applicable codes and approved operating sequence
- Power, network/radio, standby and outage behavior
- Current product lifecycle, firmware and integration compatibility
- Training, documentation, inspection and preventive maintenance
- Engineering and privacy
- FAAC barriers
- FAAC automation portfolio
- Gate type, weight, length and travel
- Daily cycles and peak traffic
- Monitored entrapment-protection devices
- Vehicle loops, photo eyes and safety edges
Decisions to document before procurement
The project team should be able to answer each point below before equipment is released. Unresolved items belong in the assumptions and exclusions, not in field improvisation.
- Design monitored entrapment protection, vehicle detection, pedestrian controls and emergency access as one system.
- Coordinate credentials, telephone entry, intercom, license-plate workflows and property-management requirements.
- Verify branch power, grounding, surge protection, battery or solar expectations and communications pathways.
- Account for traffic queues, delivery vehicles, first responders, maintenance access and manual operation.
Planning for North and South Carolina facilities
A Charlotte-area headquarters, a Triangle campus and a Lowcountry property may use the same platform differently. The project record should distinguish site-level constraints while keeping credentials, retention, cybersecurity and support standards consistent across the portfolio.
Our operating address is 6201 Fairview Rd, Charlotte, North Carolina 28210 - USA. From there, the team evaluates North and South Carolina opportunities individually rather than promising identical availability in every municipality.
A practical delivery sequence
1. Scope intake
Gather locations, quantities, schedules, standards and the constraints already known by the owner. The FAAC Barriers, Access Accessories and Safety scope should identify the evidence produced at this stage.
2. Engineering check
Confirm capacity, compatibility, environmental conditions and failure-mode requirements. The FAAC Barriers, Access Accessories and Safety scope should identify the evidence produced at this stage.
3. Commissioning plan
Define tests and expected outcomes before field work so acceptance is objective. The FAAC Barriers, Access Accessories and Safety scope should identify the evidence produced at this stage.
4. Lifecycle record
Leave the owner with versions, licenses, diagrams, configurations and maintenance responsibilities. The FAAC Barriers, Access Accessories and Safety scope should identify the evidence produced at this stage.
Lifecycle, updates and official resources
Availability and compatibility can change after a page is published. The project team must validate the current release, supported hardware and required licenses directly with the manufacturer. Any update should have a tested backup and rollback approach.
Build a site-specific scope
A useful first conversation includes the current system, number of sites, operational problem, desired timeline and any owner standards. We can then evaluate the role of FAAC Barriers, Access Accessories and Safety in the project.
Official FAAC software, firmware and support
Use the manufacturer links below for current software, firmware, release notes, manuals and technical resources. 360 Mobile Vision links directly to official manufacturer portals and does not copy or host firmware files.
Before installing an update: verify the exact model, region, hardware revision, current version, required intermediate releases, licensing or support entitlement, backup and rollback plan, integrations and maintenance window. An incorrect firmware package or upgrade sequence can interrupt service, invalidate compatibility or prevent a downgrade. Coordinate updates for monitored, life-safety-adjacent or business-critical systems with the system administrator and an authorized specialist.
Some resources require a customer, dealer, certified-technician or active-support login. Cloud-managed products may update automatically and may not provide a public firmware file.
