Installation and lifecycle support • NC & SC

New installation, existing-system service and ongoing support

For FAAC Gate Operators, Entry and Safety Systems, 360 Mobile Vision can supply the equipment, engineer the system, perform the installation, configure and test it, repair existing deployments, complete scheduled maintenance and remain available for technical support throughout North and South Carolina.

  • Product Supply
  • System Installation
  • Service & Repair
  • Maintenance & Upgrades
  • Technical Support

New installation: Need a complete project? We can take it from product selection through commissioning and handoff.

Existing system: Need help with installed equipment? We service, troubleshoot, maintain and expand existing systems.

Authorized · Certified · Carolinas

Authorized FAAC dealer, certified installer and integrator

360 Mobile Vision sells, installs, programs and services FAAC for businesses across North and South Carolina — hydraulic swing, slide and underground operators, barriers and safety accessories. Being the authorized dealer as well as the installer is what gets you genuine equipment, a valid warranty and a manufacturer support path when something needs escalating.

  • DealerWe quote and supply genuine FAAC equipment, licensing and subscriptions.
  • InstallerOur own technicians run the cable, mount the hardware, set the software up and test it — not a subcontractor you have never met.
  • IntegratorWe make it work with the cameras, doors, network and identity systems already in the building, rather than leaving you with two systems that do not talk.
  • Still here afterwardsService, repair, expansion and takeover of systems somebody else installed. Emergency cover round the clock.

Gate operator and entry-system guide

FAAC Gate Operators, Entry and Safety Systems

A FAAC gate project combines moving machinery, access control and entrapment protection. Operator selection must follow the gate, duty cycle, travel, wind load, site geometry and required safety devices rather than replacing a failed unit with the nearest model number.

FAAC Barriers, Access Accessories and Safety planning reference

Start with the system architecture

FAAC product names describe parts of a solution, not the complete installed result. A responsible design also covers power, pathways, network, software or subscriptions, compatible accessories, integrations, environmental conditions, user administration, testing and long-term support. Those dependencies should be visible in the proposal instead of left for the field team to discover.

The product-family sections below summarize the principal choices represented on this site. Availability, model numbers, software packaging and regional support can change. Final selection is verified against current manufacturer documentation and the actual site before procurement.

New systems

Develop the architecture from measured conditions, operating requirements and a written acceptance plan.

Existing-system expansion

Inventory installed models, versions, licenses, capacity and support status before promising compatibility.

Phased migration

Separate reusable infrastructure from weak credentials, obsolete controllers, unsupported software and unreliable field devices.

Multi-site standards

Create repeatable naming, configuration, testing and handoff rules while preserving a survey for each location.

FAAC Barriers, Access Accessories and Safety

This product-family guide addresses Product and design guidance, 615 and current barrier family application fit, Lane width, beam length, speed and duty cycle.

  • Product and design guidance
  • 615 and current barrier family application fit
  • Lane width, beam length, speed and duty cycle
  • Loop detectors, photo eyes, edges and traffic signals
  • Credential/visitor control, manual release and backup power
  • Site survey, applicable codes and approved operating sequence
  • Power, network/radio, standby and outage behavior
  • Current product lifecycle, firmware and integration compatibility
  • Training, documentation, inspection and preventive maintenance
  • Engineering and privacy
  • FAAC barriers
  • FAAC automation portfolio

Open the detailed FAAC Barriers, Access Accessories and Safety guide

FAAC Barriers, Access Accessories and Safety planning reference

FAAC Hydraulic Swing, Slide and Underground Gate Operators

This product-family guide addresses Product and design guidance, 400/related hydraulic swing operator geometry, S800/underground operator drainage and foundation.

  • Product and design guidance
  • 400/related hydraulic swing operator geometry
  • S800/underground operator drainage and foundation
  • Sliding operator gate rack, track and travel
  • Control board, encoder, locks, release and monitored safety devices
  • Site survey, applicable codes and approved operating sequence
  • Power, network/radio, standby and outage behavior
  • Current product lifecycle, firmware and integration compatibility
  • Training, documentation, inspection and preventive maintenance
  • Engineering and privacy
  • FAAC gate automation
  • FAAC company/product history

Open the detailed FAAC Hydraulic Swing, Slide and Underground Gate Operators guide

FAAC Hydraulic Swing, Slide and Underground Gate Operators planning reference

Decisions to document before ordering FAAC

Use these questions to turn a feature discussion into an installable scope. Any item that remains unresolved should appear as an assumption, allowance or exclusion rather than becoming an undocumented field decision.

  • Survey gate type, length, weight, balance, hinges or rollers, travel, grade, wind exposure and physical condition.
  • Confirm operator class, duty cycle, speed, horsepower, voltage, heater, battery and manual-release requirements.
  • Design monitored entrapment protection, vehicle detection, warning devices and emergency access for the complete travel area.
  • Coordinate telephone entry, card or mobile access, radio controls, loops, intercom, fire access and property workflows.
  • Document foundations, conduit, drainage, grounding, lightning protection, fencing and responsibilities shared with other trades.
  • Test normal, obstruction, entrapment, power-loss, emergency and manual-operation scenarios before handoff.

Reuse, migration and lifecycle review

An existing system may contain a mix of serviceable field hardware and components that are no longer secure, supported or economical. Record model and serial information, firmware and application versions, active licenses, administrator access, backups, warranties, spare capacity and known faults. Test reused devices instead of assuming they work because they are present.

Compare continued support, partial modernization and replacement using lifecycle cost and operational risk. A lower initial price can be misleading if the client inherits unsupported software, weak credentials, subscription surprises, proprietary dependencies or an undocumented integration. The handoff should identify official support resources and state who owns updates, renewals, backups and recovery.

Project delivery and acceptance

1. Discovery

Define the operating problem, users, sites, critical areas, policies, existing assets and success criteria.

2. Field verification

Measure conditions, inspect infrastructure, photograph constraints and resolve responsibilities shared with other trades.

3. Design and deployment

Approve models, capacity, licensing, pathways, settings, integration ownership, test cases and the installation sequence.

4. Closeout

Resolve exceptions and provide labels, test records, versions, diagrams, backups, training and official support routes.

North and South Carolina projects are coordinated from Charlotte. Coverage and scheduling depend on the site count, scope, required trades, field conditions and support expectations.

FAAC planning questions

Can existing equipment be reused?

Possibly. Reuse depends on exact models, condition, protocol, firmware, software support, capacity and the target security or performance level. A survey and supported compatibility check are required before reuse becomes part of the proposal.

How are product models selected?

Models are selected from the required function, site conditions, capacity, environment, integrations, lifecycle and current availability. A catalog feature alone is not a substitute for those design inputs.

Who manages software, subscriptions and updates?

The project scope should name the client and service responsibilities for accounts, licenses, renewals, backups, release review, maintenance windows and recovery. Software and firmware come only from official manufacturer resources.

What should be tested at handoff?

Acceptance should prove normal operation, invalid or exception behavior, loss of power or communications, alerts, integrations, user permissions, reporting and the owner’s ability to perform routine administration.

Can 360 Mobile Vision service an existing FAAC system?

We can inventory the installed environment, identify deficiencies and evaluate repair, expansion, migration or replacement. Manufacturer entitlement, administrator access and current support status are confirmed during discovery.

Official product and lifecycle resources

Use current manufacturer-controlled documentation for model availability, software, firmware, compatibility and release notes. 360 Mobile Vision links to official resources and does not redistribute firmware files.

Build a site-specific FAAC scope

Share the locations, quantities, existing models, required integrations, network or power constraints, desired schedule and support expectations. That information allows a focused survey and product-family comparison.

Request a project consultation

FAAC Gate Openers: planning details and decision points

A complete FAAC Gate Openers design should connect the manufacturer’s product families to the site’s doors, camera views, alarm zones, users and response procedures. Product selection should follow required functions, integrations and lifecycle support—not a single headline feature.

  • System fit: Confirm the number and type of openings, cameras, zones, users, sites and operator workstations.
  • Product families: Compare controllers, readers, credentials, locks, sensors, cameras, appliances and management options that apply to the project.
  • Integration: Validate identity, video, intercom, intrusion, elevator, visitor and network dependencies before ordering.
  • Resilience: Document power, battery, network-loss behavior, local decision making, recording and recovery procedures.
  • Lifecycle: Confirm current models, subscriptions, warranty, official software resources and the client’s update responsibilities.

Information that improves the proposal

Before pricing, gather available drawings, site counts, existing model numbers, known trouble areas, preferred management methods, required integrations and the people who will approve the final result. This lets the project specialist distinguish required work from options and avoids basing the design on assumptions.

Related choices on this site include Security Company home text, Doorking DKS Gate Operator. Review those guides together when the systems share cabling, identity, network or operating requirements.

From assessment to a usable handoff

A dependable FAAC Gate Openers scope should move through four documented stages:

  1. Discover: verify field conditions, users, existing assets, constraints, priorities and the desired operating result.
  2. Design: compare practical options, identify tradeoffs, confirm compatibility and establish a written basis of design.
  3. Deliver: coordinate scheduling and responsibilities, install or configure the approved scope, and record changes found in the field.
  4. Validate: test the agreed functions, resolve exceptions, train the responsible users and provide the final documentation.

This sequence gives the client clear review points before purchasing decisions become difficult to change. It also creates a better basis for comparing proposals: equipment, labor, subscriptions, exclusions, testing and support can be evaluated as parts of one operating plan instead of as unrelated line items.

Official FAAC software, firmware and support

Use the manufacturer links below for current software, firmware, release notes, manuals and technical resources. 360 Mobile Vision links directly to official manufacturer portals and does not copy or host firmware files.

Before installing an update: verify the exact model, region, hardware revision, current version, required intermediate releases, licensing or support entitlement, backup and rollback plan, integrations and maintenance window. An incorrect firmware package or upgrade sequence can interrupt service, invalidate compatibility or prevent a downgrade. Coordinate updates for monitored, life-safety-adjacent or business-critical systems with the system administrator and an authorized specialist.

Some resources require a customer, dealer, certified-technician or active-support login. Cloud-managed products may update automatically and may not provide a public firmware file.